Permits & Applications

Listing of Fees

Please use the following list of permit fees to find the information you need.

Building Permit

TypeMinimumAdditional Costs
Residential$65plus $6.50 per $1,000 over $10,000
Commercial$80plus $8 per $1,000 over $10,000


Back to Top

Plumbing Permit

TypeMinimumAdditional Costs
Residential$65plus $6.50 per $1,000 over $10,000
Commercial$80plus $8 per $1,000 over $10,000


Back to Top

Electrical Permit

TypeMinimumAdditional Costs
Residential$65plus $6.50 per $1,000 over $10,000
Commercial$80plus $8 per $1,000 over $10,000


Back to Top

Mechanical Permit

TypeMinimumAdditional Costs
Residential$65plus $6.50 per $1,000 over $10,000
Commercial$80plus $8 per $1,000 over $10,000


Back to Top

Fire Places Permit

TypeMinimumAdditional Costs
Residential$65plus $6.50 per $1,000 over $10,000
Commercial$80plus $8 per $1,000 over $10,000


Back to Top

Sign Permit (PDF)

  • $100 per application

Temporary Banner Permit Application (PDF) 

Back to Top

Demolition

Type
Permit Cost
Residential
$150 permit fee
Commercial
$550 permit fee


Back to Top

Sewer Tap

Extra charge for equipment and installation of tap by City personnel

TypePermit Cost
Residential$2,000: $200 for each additional unit
Commercial$2,500: $200 for each additional unit


Back to Top

Water Tap

1 inch and over, contact the Community Services Director; Extra charge for equipment and installation of tap by City personnel

TypePermit Cost
3/4 inches$2,000, Includes meter
1 inch$2,500 to $600 labor per hour plus 15% on equipment cost
1 1/2 inches$3,500 to $600 labor per hour plus 15% on equipment cost


Back to Top

Re-Inspection Fees

TypeCost
Residential First Re-Inspection$50
Second Re-Inspection$100
Commercial First Re-Inspection$70
Second Re-Inspection$140


Back to Top

Other Permits

TypeCost
Boarded Up Property Registration(Application) (PDF) $65
Temporary Storage Unit/PODS(30 day limit) $50 Residential
$80 Commercial
Sign Permit
Mural Permit
$100
$50


Electrical Pole Services (Proposed)$100
In-Ground Swimming Pool Permit$65
Above-Ground Swimming Pool$80
Elevator or EscalatorState Department of Labor
Land DisturbanceMinimum $1,000 plus 1% over $100,000
ExcavationMinimum $1,000 plus 1% over $100,000
Water Deposit$100 Residential, $300 Commercial
Moving House (In or out of City or through City)$600
Tree Removal - Permit Application
$25 per tree (permit required)
Arborist$150
Plan Review Fee by Consultants (A plan review fee must be paid, which shall be equal to one-half of the fee required for the building permit)Minimum fee for plan review is $100


Back to Top

Penalties

Where work has been started prior to obtaining a permit, the fees specified herein shall be charged an additional amount based on the approximate cost to enforce compliance with this section.

Back to Top

Other Fees

Planning and Zoning Fee Structure Analysis and Recommendation Memorandum (PDF)

TypeFee
Site Plan or Conditional Use Permit$400 (Planning Commission Application) (PDF)
Subdivision(Subdivision Application Preliminary and Final) (PDF)
Preliminary Plat$300 plus $10 per lot
Final Plat$250 plus $5 per lot
Design Review$100 Application (PDF) Fee (for design review that does not require Planning Commission)
Zoning Letters$75 to $250 per parcel
Zoning Appeals$350
Pre-Submittal Review$100
Expedited ReviewDouble the regular fees


Back to Top