- Home
- Departments
- Community Services
- Permits & Applications
Permits & Applications
Listing of Fees
Please use the following list of permit fees to find the information you need.
Building Permit
Type | Minimum | Additional Costs |
---|---|---|
Residential | $65 | plus $6.50 per $1,000 over $10,000 |
Commercial | $80 | plus $8 per $1,000 over $10,000 |
Plumbing Permit
Type | Minimum | Additional Costs |
---|---|---|
Residential | $65 | plus $6.50 per $1,000 over $10,000 |
Commercial | $80 | plus $8 per $1,000 over $10,000 |
Electrical Permit
Type | Minimum | Additional Costs |
---|---|---|
Residential | $65 | plus $6.50 per $1,000 over $10,000 |
Commercial | $80 | plus $8 per $1,000 over $10,000 |
Mechanical Permit
Type | Minimum | Additional Costs |
---|---|---|
Residential | $65 | plus $6.50 per $1,000 over $10,000 |
Commercial | $80 | plus $8 per $1,000 over $10,000 |
Fire Places Permit
Type | Minimum | Additional Costs |
---|---|---|
Residential | $65 | plus $6.50 per $1,000 over $10,000 |
Commercial | $80 | plus $8 per $1,000 over $10,000 |
- $100 per application
Temporary Banner Permit Application (PDF)
Demolition
Type | Permit Cost | ||
---|---|---|---|
Residential | $150 permit fee | ||
Commercial | $550 permit fee |
Sewer Tap
Extra charge for equipment and installation of tap by City personnel
Type | Permit Cost |
---|---|
Residential | $2,000: $200 for each additional unit |
Commercial | $2,500: $200 for each additional unit |
Water Tap
1 inch and over, contact the Community Services Director; Extra charge for equipment and installation of tap by City personnel
Type | Permit Cost |
---|---|
3/4 inches | $2,000, Includes meter |
1 inch | $2,500 to $600 labor per hour plus 15% on equipment cost |
1 1/2 inches | $3,500 to $600 labor per hour plus 15% on equipment cost |
Re-Inspection Fees
Type | Cost |
---|---|
Residential First Re-Inspection | $50 |
Second Re-Inspection | $100 |
Commercial First Re-Inspection | $70 |
Second Re-Inspection | $140 |
Other Permits
Type | Cost |
---|---|
Boarded Up Property Registration | (Application) (PDF) $65 |
Temporary Storage Unit/PODS | (30 day limit) $50 Residential $80 Commercial |
Sign Permit Mural Permit | $100 $50 |
Electrical Pole Services (Proposed) | $100 |
In-Ground Swimming Pool Permit | $65 |
Above-Ground Swimming Pool | $80 |
Elevator or Escalator | State Department of Labor |
Land Disturbance | Minimum $1,000 plus 1% over $100,000 |
Excavation | Minimum $1,000 plus 1% over $100,000 |
Water Deposit | $100 Residential, $300 Commercial |
Moving House (In or out of City or through City) | $600 |
Tree Removal - Permit Application | $25 per tree (permit required) |
Arborist | $150 |
Plan Review Fee by Consultants (A plan review fee must be paid, which shall be equal to one-half of the fee required for the building permit) | Minimum fee for plan review is $100 |
Penalties
Where work has been started prior to obtaining a permit, the fees specified herein shall be charged an additional amount based on the approximate cost to enforce compliance with this section.
Other Fees
Planning and Zoning Fee Structure Analysis and Recommendation Memorandum (PDF)
Type | Fee |
---|---|
Site Plan or Conditional Use Permit | $400 (Planning Commission Application) (PDF) |
Subdivision | (Subdivision Application Preliminary and Final) (PDF) |
Preliminary Plat | $300 plus $10 per lot |
Final Plat | $250 plus $5 per lot |
Design Review | $100 Application (PDF) Fee (for design review that does not require Planning Commission) |
Zoning Letters | $75 to $250 per parcel |
Zoning Appeals | $350 |
Pre-Submittal Review | $100 |
Expedited Review | Double the regular fees |